September 2026: The Steel Frame Goes Up
With the concrete cured, the steel structure for the new roof and the rooftop pool is now being erected. Here is where Nest A22 stands this month.

Last month the structure was validated by the authorities and the concrete was poured. This month Nest A22 goes vertical: the steel frame that will carry the new roof and the rooftop pool is being erected over the villa.
From concrete to steel
The permit for Nest A22 covers an extension, internal modifications and an additional roof. That new roof is what now takes shape. With the reinforced footings, beams and slabs cured and signed off by the Dubai Development Authority, a mobile crane is on site lifting the steel members into position, and a team of around thirty is bolting the portal frames onto the existing structure, keeping the works moving at pace.
This steel skeleton is what allows the villa to do something no other house in Al Barari does: carry a pool on its roof. It is engineered to take that load, and it is the reason the earlier months were spent reinforcing the structure before anything was built upward.

Where we are
The pool and the garden below
On the ground, the free-form garden pool has been formed. The two pools, garden below and roof above, are what define the house.

Validated in concrete, now rising in steel.
Finished to an ultra-luxury standard
Nest A22 is being finished to an ultra-luxury standard, and it is coming together quickly.
September on site
Dated photographs from the site this month. Tap any image to enlarge.
What happens next
From here the steel roof frame is completed, then the roof slab and the rooftop pool structure, followed by the mechanical, electrical and plumbing works and the finishes. The glazing closes the house, the joinery goes in, and the landscaping comes last, all delivered to an ultra-luxury standard. The works are moving at pace, and completion is targeted for the end of the first quarter of 2027.
Once complete, the villa will be brought to market during 2027, with the aim of securing the best possible price. The sale will be handled by Maria Morris Global and Driven Properties (Forbes Global Properties), specialists in Dubai luxury real estate.
Our team is on site regularly with the contractor, Probuild Contracting L.L.C, and our engineering consultant, Al Hilal Engineering Consultants. We are eager to keep sharing this progress, and we will publish these updates with dated photographs and video at each stage. If you are an investor or a buyer and would like the full document pack, including the permit and the engineering set, please reach out and we will send it directly.
Photographs and video are from the site in September 2026. Images described as visualisations elsewhere on this site are artist’s impressions of the finished villa. Nothing on this page is an offer, solicitation, or investment advice.
See Nest A22 for yourself
For pricing, the full specification, floor plans and private viewings, speak with the team.
Enquire about Nest A22