Project Update

October 2026: Roof Framed, Finishes Begin Inside

The steel roof frame is in place, the garden pool walls are built, and the first interior finishes have begun. Here is where Nest A22 stands this month.

The steel roof frame in place over Nest A22, Al Barari, October 2026
Nest A22, Al Barari, 1 October 2026: the steel roof frame in place over the villa.

Last month the steel was going up. This month it is framed out: the roof structure is in place over the villa, the garden pool walls are built, and the first finishes have begun inside.

The roof is framed

The steel structure for the new roof, the additional roof covered by the permit, is now in place. Seen from below, the full grid of roof beams is there, and the frame spans the entrance as well. This is the structure that carries the rooftop pool, the only one of its kind in Al Barari.

The steel roof framing of Nest A22 seen from below, October 2026
The steel roof framing, seen from below, 1 October 2026.

The garden pool takes shape

On the ground, the free-form garden pool walls are built, with the central circular platform, and the rendering has begun.

The free-form garden pool walls built and being rendered at Nest A22, October 2026
The garden pool walls built and being rendered, 1 October 2026.

Where we are

Roof
steel frame in place
Pool
garden walls built
Q1 2027
targeted completion

Finishes begin inside

Inside, the scaffolding is up and the first works have begun: the plasterboard ceilings are going in, and the formwork is in place around the columns and openings. Outside, the waterproofing membrane has been applied to the walls. Nest A22 is being finished to an ultra-luxury standard, and the works are moving at pace.

The first plasterboard ceilings going in inside Nest A22, October 2026
The first plasterboard ceilings going in, 1 October 2026.
Walking the site, Nest A22, 1 October 2026.

October on site

Dated photographs from the site this month. Tap any image to enlarge.

The steel roof frame over the entrance of Nest A22, October 2026 The steel roof framing seen from below at Nest A22 The free-form garden pool walls built at Nest A22 Ground-floor area of Nest A22 with steel members on site The team working with formwork inside Nest A22 A plasterboard ceiling installed inside Nest A22, October 2026 Waterproofing membrane applied to the external walls of Nest A22 Inside the structure of Nest A22 with scaffolding, October 2026

What happens next

From here the roof is completed and closed, the mechanical, electrical and plumbing works and the finishes continue, and the landscaping comes last, all to an ultra-luxury standard. The works are moving at pace, and completion is targeted for the end of the first quarter of 2027.

Once complete, the villa will be brought to market during 2027, with the aim of securing the best possible price. The sale will be handled by Maria Morris Global and Driven Properties (Forbes Global Properties), specialists in Dubai luxury real estate.

Our team is on site regularly with the contractor, Probuild Contracting L.L.C, and our engineering consultant, Al Hilal Engineering Consultants. We are eager to keep sharing this progress, and we will publish these updates with dated photographs and video at each stage. If you are an investor or a buyer and would like the full document pack, including the permit and the engineering set, please reach out and we will send it directly.

Photographs and video are from the site on 1 October 2026. Images described as visualisations elsewhere on this site are artist’s impressions of the finished villa. Nothing on this page is an offer, solicitation, or investment advice.