Project Update

August 2026: Validated, Poured, and Moving Fast

The municipality has signed off the structure, the concrete is poured, the pool is being set out, and the fit-out is ordered. Here is where Nest A22 stands this month.

Nest A22 under construction in Al Barari, the reinforced structure standing among the trees, August 2026
Nest A22, Al Barari, August 2026: the reinforced structure standing, works advancing across the plot.

This is the update we have been waiting to give: the villa has cleared its most important checkpoint, and it is now moving quickly on every front. Here is exactly where Nest A22 stands in August 2026.

Why the last months were deliberate

Nest A22 is a full transformation of an existing villa: reinforced and extended to carry a rooftop pool the original house was never built to hold. Before any concrete could be cast for the foundations, beams and slabs, the Dubai Development Authority had to inspect and approve those modifications to the structure. We deliberately slowed the works to clear that step properly.

That approval has now been granted: the permit for the structural modifications is signed off, and we can move forward. With it in hand we were cleared to pour the concrete, which is what you can see in this month’s photographs. The structure is reinforced and validated, and the project is now advancing on several fronts at once, as set out below.

Reinforced and cast concrete footings at Nest A22 after the Dubai Development Authority approval
The reinforced footings, cast after the Dubai Development Authority’s structural approval.

Where we are

Validated
structure approved by the DDA
Poured
foundations, beams & slabs cast
Q1 2027
estimated delivery

The pool has begun

With the structure validated, the signature element of Nest A22 is now taking shape on the ground: the free-form garden pool is being set out, alongside the reinforcement that lets the villa carry its rooftop pool, the only one of its kind in Al Barari.

The free-form garden pool being set out at Nest A22, August 2026
The free-form garden pool being set out on site, August 2026.
Approved on paper, poured in concrete, and already taking the shape of the finished home.

The fit-out is already ordered

We have not waited for the structure to finish before securing what goes inside it. The long-lead elements have been ordered and deposits paid: the glazing and bay windows, the air-conditioning, the marble, the dressing rooms and the kitchen. In practice, everything except the landscaping and planting has now been launched. Ordering early protects the timeline and locks in the specification the villa was designed around.

Inside the reinforced concrete frame of Nest A22, open to the garden, August 2026
Inside the frame: the ground floor opening to the garden, ready for the technical works and finishes.

What happens next

From here the sequence runs on: the mechanical, electrical and plumbing works, then the finishes and the ordered elements installed, then the pools, garden below and rooftop above, and the landscaping last. Our estimate for delivery remains the first quarter of 2027.

Our team is on site regularly with the contractor, Probuild Contracting L.L.C, and our engineering consultant, Al Hilal Engineering Consultants. We will keep publishing these updates with dated photographs at each stage. If you are an investor or a buyer and would like the full document pack, including the permit and the engineering set, please reach out and we will send it directly.

Photographs are from the site in August 2026. Images described as visualisations elsewhere on this site are artist’s impressions of the finished villa. Nothing on this page is an offer, solicitation, or investment advice.